Photo 19.
[Back to Index | Previous Photo | Next Photo ]

Righting the 411 only took one attempt and about 5 minutes total.  The 416 gave a little tug and presto, we're rolling again.  Note the flex in the down hill tire.  I was running about 8 PSI, so I am suprised I did not de-bead the tire.  Just a note, it looks flat, but the view is at about a 20 degree slope up.